24v Installation and Service Product Training (Doral)

This training will include an overview of the refrigerant piping program. Review installation procedures, mitigation operation, wiring and configuration/consideration of thermostat on single as well as multi-speed products. Troubleshooting the Mitigation Control Board, Identifying and troubleshooting 16-Pin ECM and 4-Pin VS blower motors as well as Troubleshooting metering components including stepper motor and temperature sensors.

Recommended LMS/Field Tech Talk Sessions

A2L Installation/Service Procedures and Requirements (Part 2)

Refrigerant Line Set Design with R454b Refrigerant Systems

Customized Comfort Through BK

Mitigation Control Troubleshooting

VS Serial Port Blower Motors

VS 16 Pin Motors

EEV (Part 2) – Fault Codes & Troubleshooting

Date

Feb 24 2026
Expired!

Time

8:00 am - 12:00 pm

Location

Trane - Miami/Doral
2660 NW 89th Court
Phone
305-470-2312
QR Code
CALL (844) FL-TRANE