24v Residential Installation and Service (Melbourne)
PLEASE NOTE THIS TRAINING WILL BE TAKING PLACE AT AN OFF-SITE LOCATION! THE HOLIDAY INN CONFERENCE CENTER VIERA
This training will include an overview of the refrigerant piping program. Review installation procedures, mitigation operation, wiring and configuration/consideration of thermostat on single as well as multi-speed products. Troubleshooting the Mitigation Control Board, Identifying and troubleshooting 16-Pin ECM and 4-Pin VS blower motors as well as Troubleshooting metering device components including stepper motor and temperature sensors.
THERE IS A LIMIT OF 3 SIGNUPS PER DEALER
Recommended LMS/Field Tech Talk Sessions
A2L Installation/Service Procedures and Requirements (Part 2)
Refrigerant Line Set Design with R454b Refrigerant Systems