24v Residential Installation and Service (Melbourne)

PLEASE NOTE THIS TRAINING WILL BE TAKING PLACE AT AN OFF-SITE LOCATION! THE HOLIDAY INN CONFERENCE CENTER VIERA

This training will include an overview of the refrigerant piping program. Review installation procedures, mitigation operation, wiring and configuration/consideration of thermostat on single as well as multi-speed products. Troubleshooting the Mitigation Control Board, Identifying and troubleshooting 16-Pin ECM and 4-Pin VS blower motors as well as Troubleshooting metering  device components including stepper motor and temperature sensors.

THERE IS A LIMIT OF 3 SIGNUPS PER DEALER

Recommended  LMS/Field Tech Talk Sessions

A2L Installation/Service Procedures and Requirements (Part 2)

Refrigerant Line Set Design with R454b Refrigerant Systems

Customized Comfort Through BK

Mitigation Control Troubleshooting

VS Serial Port Blower Motors

VS 16 Pin Motors

EEV (Part 2) – Fault Codes & Troubleshooting

Date

Nov 06 2025
Expired!

Time

8:00 am - 12:00 pm

Location

Holiday Inn Viera - Conference Center
8298 N. Wickham Rd. Melbourne, FL 32940
QR Code
CALL (844) FL-TRANE